CALL 32-Installation of OSP – East Range Bldg. 6039 to Bldg. 6508 Leilehua Golf Course
Description
Na Ali’i Consulting and Sales, LLC, subcontracted Bristol to install the Outside Plant (OSP) from East Range Building 6039 to Leilehua Golf Course Building 6508. The project consists of 2,000 feet of fiber optic cable in conduit and over 1,200 feet of 6-inch duct, placed by horizontal directional drilling (HDD). This method extends fiber optic connectivity and infrastructure through the golf course with minimal disturbance to the course and cart paths.
CALL 32-Installation of OSP – East Range Bldg. 6039 to Bldg. 6508 Leilehua Golf Course
Client: Na Ali’i Consulting & Sales, LLC, PES HI DITCO BOA
Location: Hawaii
service line: Communications & Electrical
contract amount: $365,000
Award Date: September 2020
completed date: September 2021
contract amount: $365,000
Award Date: September 2020
completed date: September 2021
SB
Highlights
- The Leilehua Golf course opened in 1948, so to minimize impact to the existing course, Bristol utilized HDD
Highlights
- The Leilehua Golf course opened in 1948, so to minimize impact to the existing course, Bristol utilized HDD